"Our combined experience provides a resume of over fifty (50) landfill gas projects producing over 150 Megawatts of power and consuming in the billions of cubic feet of landfill gas daily."

LFG Technologies

LFG Project History

 

LFG Technologies leads the industry in designing, specifying, constructing, procuring equipment, and starting up landfill gas to energy projects.  Below is a list of selected projects we have engineered and/or developed while with LFG Technologies (since FY2000) or with previous employers (prior to FY2000).  This gives us a combined experience level with landfill gas to energy projects of more than any company in the industry.

 

Plant Name & Location Developer/Owner Project Type Project Description Start Up Date
Maysville-Mason County, KY East Kentucky Power Electric Engineering, Startup Services Single 3520C, 1.6 MW Winter 2008
         
Twin Bridges III Expansion Wabash Valley Power Electric Engineering, Fuel Gas Booster, Construction Oversight, Startup Services for four CAT 3516 SITA, 3.2 MW Winter

2008

         
Winnebago Landfill, Rockford, IL Integrys Energy Services Electric Engineering peer review, fuel gas boosters, and start up services for four CAT 3520C, initial 6.4 MW capacity December

2007

         
Deercroft Expansion Wabash Valley Power Electric Full design service, procurement, construction QA and startup for a four CAT G3516, 3.2MW capacity, LFG fueled power plant September 2007
         
Prairie View Expansion Wabash Valley Power Electric Full design service, procurement, construction QA and startup for a four CAT G3516, 3.2MW capacity, LFG fueled power plant August 2007
         
Pendleton County Landfill Butler, KY East Kentucky Power Coop. Electric Full Design services, procurement, construction QA and startup for a five CAT G3516, 4.0 MW capacity, LFG fueled power plant November  2006
         
Pearl Hollow LF (Hardin County) Elizabethtown, KY East Kentucky Power Coop. Electric Full design services, procurement, construction QA and startup for five CAT G3516, 4.0 MW capacity, LFG fueled power plant. December 2005
         
Development Authority of the North Country (DANC) - Rodman, NY New York Power Authority/DANC Electric Feasibility Study Complete 2004
         
Fulton County, NY New York Power Authority/Fulton County Electric Feasibility Study Complete 2004
         
Bavarian LF, Walton, KY East Kentucky Power Coop. Electric Full Design services, procurement, construction QA and startup for a four CAT G3516, 3.2 MW capacity, LFG fueled power plant Fall 2003
         
Green Valley LF, Grayson, KY East Kentucky Power Coop. Electric Full Design services, procurement, construction QA and startup for a four CAT G3516, 3.2MW capacity, LFG fueled power plant Fall 2003
         
Laurel Ridge LF, Lily, KY East Kentucky Power Coop. Electric Full Design services, procurement, construction QA and startup for a four CAT G3516, 3.2 MW capacity, LFG fueled power plant Fall 2003
         
Twin Bridges Expansion, Danville, IN Wabash Public Power Electric Full Design services and startup for a four CAT G3516, 3.2 MW capacity, LFG fueled power plant  April 2002
         
Douglas County, Omaha, Nebraska Omaha Public Power District Electric Full Design services, and startup for a four CAT G3516, 3.2 MW capacity, LFG fueled power plant May 2001
         
Northside LF, Jacksonville, FL Jacksonville Electric Authority Electric Mechanical/electrical engineering, procurement for a medium BTU gas compression and dehydration facility.  3.6 MMSCFD capacity July 1999
         
PEI Corp, Scranton, PA Organic Waste Technologies/PEI Direct Gas Mechanical/electrical engineering, procurement for a medium BTU gas compression and dehydration facility.  3.6 MMSCFD capacity June 1998
         
Modern Landfill, York, PA Waste Management/Republic Industries Electric Mechanical engineering, equipment procurement and start up for three CAT G3616 LFG fueled reciprocating engine/generator facility, 9.0 MW capacity May 1998
         
Turnkey II, Rochester, NH Waste Management, Inc. Electric Mechanical engineering, equipment procurement and start up for two Solar Centaur turbines, 6.0 MW capacity. December 1997
         
Girvin Road, Jacksonville, FL Jacksonville Electric Authority Electric Full Design services and startup for a four CAT G3516, 3.2 MW capacity, LFG fueled power plant July 1997
         
Lake View LF, Erie, PA Waste Management, Inc. Electric Mechanical engineering, equipment procurement and start up for two CAT G3616 LFG fueled reciprocating engine/generator facility, 6.0 MW capacity May 1997
         
Wheeler, Wheeler, IN Waste Management, Inc. Electric Mechanical engineering, equipment procurement and start up for three CAT G3516 LFG fueled reciprocating engine/generator facility, 2.4 MW capacity January 1997
         
Greene Valley, Naperville, IL Waste Management, Inc. Electric Mechanical engineering, equipment procurement and start up for three Solar Centaur turbines, 9.0 MW capacity. June 1996
         
DFW, Lewisville, TX Waste Management, Inc. Electric Mechanical engineering, equipment procurement and start up of a single Solar Centaur turbine LFG fired generator in an existing facility; 3.0 MW facility December 1995
         
Deercroft, Michigan City, MI Waste Management, Inc. Electric Mechanical and electrical engineering, equipment procurement and start up for a four CAT G3516 LFG fueled reciprocating engine generator facility; 3.2 MW capacity July 1995
         
Keystone Recovery, Scranton, PA Emcon/OWT Electric Turnkey development, mechanical/electrical engineering, equipment procurement and start up for a seven CAT G3516 LFG fueled reciprocating engine/generator facility, 5.6 MW capacity November 1994
         
Prairie View, Wyatt, IN Waste Management, Inc. Electric Mechanical and electrical engineering, equipment procurement and start up for a four CAT G3516 LFG fueled reciprocating engine generator facility, 3.2 MW capacity September 1994
         
Twin Bridges, Danville, IN Waste Management, Inc. Electric Mechanical and electrical engineering, equipment procurement and start up for a three CAT G3516 LFG fueled reciprocating engine generator facility, 2.4 MW capacity September 1994
         
Metro Methane, Mitchellville, IA Waste Management, Inc. Electric Mechanical/electrical engineering, equipment procurement and start up for a seven CAT G3516 LFG fueled reciprocating engine/generator facility, 5.6 MW capacity November 1993
         
BJ Landfill, Norcross, GA Waste Management, Inc. Electric Mechanical and electrical engineering, equipment procurement and start up for a three CAT G3516 LFG fueled reciprocating engine generator facility, 2.4 MW capacity June 1993
         
Omega Hills LF, Germantown, WI Waste Management, Inc. Electric Engineering and project management for a single prototype CAT G3606 LFG fueled reciprocating engine/generator installed in an existing building.  Supervised field testing. October 1992
         
Lake II, Northbrook, IL Waste Management, Inc. Electric Electrical engineering, equipment procurement and start up for a two Solar Centaur turbine LFG fueled generator facility; 6.0 MW capacity May 1992
         
Chestnut Ridge, Heiskell, TN Waste Management, Inc. Electric Mechanical and electrical engineering, equipment procurement and start up for a four CAT G3516 LFG fueled reciprocating engine generator facility, 3.2 MW capacity January 1992
         
Mohawk Valley, Frankfort, NY Waste Management, Inc. Electric Mechanical and electrical engineering, equipment procurement and start up for a two CAT G3516 LFG fueled reciprocating engine generator facility, 1.6 MW capacity December 1991
         
New Milford, New Milford, CT Waste Management, Inc. Electric Mechanical engineering, equipment procurement and start up of a single Solar Centaur turbine LFG fired generator in an existing facility; 3.0 MW facility June 1991
         
High Acres, Fairport, NY Waste Management, Inc. Electric Mechanical and electrical engineering, equipment procurement and start up for a four CAT G3516 LFG fueled reciprocating engine generator facility, 3.2 MW capacity May 1991
         
Stowe, Pottstown, PA Waste Management, Inc. Electric Mechanical engineering, equipment procurement and start up of a single Solar Centaur turbine LFG fired generator in an existing facility; 3.0 MW facility April 1991
         
L&D, Mt. Holly, NJ Waste Management, Inc. Electric Electrical and mechanical engineering and start up for a single Solar Centaur and a Solar Saturn turbine generator LFG fueled facility; 4.1 MW capacity. March 1990
         
CDSL, Pompano Beach, FL Waste Management, Inc. Electric Electrical engineering and start up for a five Solar Centaur LFG fueled generator facility, 15.0 MW capacity May 1989
         
Monroe Livingston, Scottsville, NY Waste Management, Inc. Electric Mechanical and electrical engineering, equipment procurement and start up for a four CAT G3516 LFG fueled reciprocating engine generator facility, 3.2 MW capacity December 1988
         
ELDA, Cincinnati, OH Waste Management, Inc. Direct Gas Equipment procurement and start up for a medium BTU gas compression and dehydration facility for customer end-use gas; 3.6 MMSCFM capacity. April 1988
         
         
         