Projects
LFG Technologies leads the industry in designing, specifying, constructing, procuring equipment, and starting up landfill gas to energy projects. Below is a list of selected projects we have engineered and/or developed while with LFG Technologies (since FY2000) or with previous employers (prior to FY2000). This gives us a combined experience level with landfill gas to energy projects of more than any company in the industry.
Plant Name & Location |
Developer/Owner |
Project Type |
Project Description |
Start Up Date |
| Steuben LFG | Steuben Rural Electric Cooperative | Electric | EPC Contractor, 2- 3520C, 3.2 MW | June 2010 |
| Perdido PPP | Gulf Power | Electric | EPC Contractor, 2 – CAT 3520C, 3.2 MW | May 2010 |
| Billings Gas Plant | Montana-Dakota Utilities | High BTU | Mechanical/Electrical engineering, compressors, flares and electrical generation | August 2010 |
| Maysville-Mason County, KY | East Kentucky Power | Electric | Engineering, Startup Services Single 3520C, 1.6 MW | Winter 2008 |
| Twin Bridges III Expansion | Wabash Valley Power | Electric | Engineering, Fuel Gas Booster, Construction Oversight, Startup Services for four CAT 3516 SITA, 3.2 MW | Winter 2008 |
| Winnebago Landfill, Rockford, IL | Integrys Energy Services | Electric | Engineering peer review, fuel gas boosters, and start up services for four CAT 3520C, initial 6.4 MW capacity | December 2007 |
| Deercroft Expansion | Wabash Valley Power | Electric | Full design service, procurement, construction QA and startup for a four CAT G3516, 3.2MW capacity, LFG fueled power plant | September 2007 |
| Prairie View Expansion | Wabash Valley Power | Electric | Full design service, procurement, construction QA and startup for a four CAT G3516, 3.2MW capacity, LFG fueled power plant | August 2007 |
| Pendleton County Landfill Butler, KY | East Kentucky Power Coop. | Electric | Full Design services, procurement, construction QA and startup for a five CAT G3516, 4.0 MW capacity, LFG fueled power plant | November 2006 |
| Pearl Hollow LF (Hardin County) Elizabethtown, KY | East Kentucky Power Coop. | Electric | Full design services, procurement, construction QA and startup for five CAT G3516, 4.0 MW capacity, LFG fueled power plant. | December 2005 |
| Development Authority of the North Country (DANC) – Rodman, NY | New York Power Authority/DANC | Electric | Feasibility Study | Complete 2004 |
| Fulton County, NY | New York Power Authority/Fulton County | Electric | Feasibility Study | Complete 2004 |
| Bavarian LF, Walton, KY | East Kentucky Power Coop. | Electric | Full Design services, procurement, construction QA and startup for a four CAT G3516, 3.2 MW capacity, LFG fueled power plant | Fall 2003 |
| Green Valley LF, Grayson, KY | East Kentucky Power Coop. | Electric | Full Design services, procurement, construction QA and startup for a four CAT G3516, 3.2MW capacity, LFG fueled power plant | Fall 2003 |
| Laurel Ridge LF, Lily, KY | East Kentucky Power Coop. | Electric | Full Design services, procurement, construction QA and startup for a four CAT G3516, 3.2 MW capacity, LFG fueled power plant | Fall 2003 |
| Twin Bridges Expansion, Danville, IN | Wabash Public Power | Electric | Full Design services and startup for a four CAT G3516, 3.2 MW capacity, LFG fueled power plant | April 2002 |
| Douglas County, Omaha, Nebraska | Omaha Public Power District | Electric | Full Design services, and startup for a four CAT G3516, 3.2 MW capacity, LFG fueled power plant | May 2001 |
| Northside LF, Jacksonville, FL | Jacksonville Electric Authority | Electric | Mechanical/electrical engineering, procurement for a medium BTU gas compression and dehydration facility. 3.6 MMSCFD capacity | July 1999 |
| PEI Corp, Scranton, PA | Organic Waste Technologies/PEI | Direct Gas | Mechanical/electrical engineering, procurement for a medium BTU gas compression and dehydration facility. 3.6 MMSCFD capacity | June 1998 |
| Modern Landfill, York, PA | Waste Management/Republic Industries | Electric | Mechanical engineering, equipment procurement and start up for three CAT G3616 LFG fueled reciprocating engine/generator facility, 9.0 MW capacity | May 1998 |
| Turnkey II, Rochester, NH | Waste Management, Inc. | Electric | Mechanical engineering, equipment procurement and start up for two Solar Centaur turbines, 6.0 MW capacity. | December 1997 |
| Girvin Road, Jacksonville, FL | Jacksonville Electric Authority | Electric | Full Design services and startup for a four CAT G3516, 3.2 MW capacity, LFG fueled power plant | July 1997 |
| Lake View LF, Erie, PA | Waste Management, Inc. | Electric | Mechanical engineering, equipment procurement and start up for two CAT G3616 LFG fueled reciprocating engine/generator facility, 6.0 MW capacity | May 1997 |
| Wheeler, Wheeler, IN | Waste Management, Inc. | Electric | Mechanical engineering, equipment procurement and start up for three CAT G3516 LFG fueled reciprocating engine/generator facility, 2.4 MW capacity | January 1997 |
| Greene Valley, Naperville, IL | Waste Management, Inc. | Electric | Mechanical engineering, equipment procurement and start up for three Solar Centaur turbines, 9.0 MW capacity. | June 1996 |
| DFW, Lewisville, TX | Waste Management, Inc. | Electric | Mechanical engineering, equipment procurement and start up of a single Solar Centaur turbine LFG fired generator in an existing facility; 3.0 MW facility | December 1995 |
| Deercroft, Michigan City, MI | Waste Management, Inc. | Electric | Mechanical and electrical engineering, equipment procurement and start up for a four CAT G3516 LFG fueled reciprocating engine generator facility; 3.2 MW capacity | July 1995 |
| Keystone Recovery, Scranton, PA | Emcon/OWT | Electric | Turnkey development, mechanical/electrical engineering, equipment procurement and start up for a seven CAT G3516 LFG fueled reciprocating engine/generator facility, 5.6 MW capacity | November 1994 |
| Prairie View, Wyatt, IN | Waste Management, Inc. | Electric | Mechanical and electrical engineering, equipment procurement and start up for a four CAT G3516 LFG fueled reciprocating engine generator facility, 3.2 MW capacity | September 1994 |
| Twin Bridges, Danville, IN | Waste Management, Inc. | Electric | Mechanical and electrical engineering, equipment procurement and start up for a three CAT G3516 LFG fueled reciprocating engine generator facility, 2.4 MW capacity | September 1994 |
| Metro Methane, Mitchellville, IA | Waste Management, Inc. | Electric | Mechanical/electrical engineering, equipment procurement and start up for a seven CAT G3516 LFG fueled reciprocating engine/generator facility, 5.6 MW capacity | November 1993 |
| BJ Landfill, Norcross, GA | Waste Management, Inc. | Electric | Mechanical and electrical engineering, equipment procurement and start up for a three CAT G3516 LFG fueled reciprocating engine generator facility, 2.4 MW capacity | June 1993 |
| Omega Hills LF, Germantown, WI | Waste Management, Inc. | Electric | Engineering and project management for a single prototype CAT G3606 LFG fueled reciprocating engine/generator installed in an existing building. Supervised field testing. | October 1992 |
| Lake II, Northbrook, IL | Waste Management, Inc. | Electric | Electrical engineering, equipment procurement and start up for a two Solar Centaur turbine LFG fueled generator facility; 6.0 MW capacity | May 1992 |
| Chestnut Ridge, Heiskell, TN | Waste Management, Inc. | Electric | Mechanical and electrical engineering, equipment procurement and start up for a four CAT G3516 LFG fueled reciprocating engine generator facility, 3.2 MW capacity | January 1992 |
| Mohawk Valley, Frankfort, NY | Waste Management, Inc. | Electric | Mechanical and electrical engineering, equipment procurement and start up for a two CAT G3516 LFG fueled reciprocating engine generator facility, 1.6 MW capacity | December 1991 |
| New Milford, New Milford, CT | Waste Management, Inc. | Electric | Mechanical engineering, equipment procurement and start up of a single Solar Centaur turbine LFG fired generator in an existing facility; 3.0 MW facility | June 1991 |
| High Acres, Fairport, NY | Waste Management, Inc. | Electric | Mechanical and electrical engineering, equipment procurement and start up for a four CAT G3516 LFG fueled reciprocating engine generator facility, 3.2 MW capacity | May 1991 |
| Stowe, Pottstown, PA | Waste Management, Inc. | Electric | Mechanical engineering, equipment procurement and start up of a single Solar Centaur turbine LFG fired generator in an existing facility; 3.0 MW facility | April 1991 |
| L&D, Mt. Holly, NJ | Waste Management, Inc. | Electric | Electrical and mechanical engineering and start up for a single Solar Centaur and a Solar Saturn turbine generator LFG fueled facility; 4.1 MW capacity. | March 1990 |
| CDSL, Pompano Beach, FL | Waste Management, Inc. | Electric | Electrical engineering and start up for a five Solar Centaur LFG fueled generator facility, 15.0 MW capacity | May 1989 |
| Monroe Livingston, Scottsville, NY | Waste Management, Inc. | Electric | Mechanical and electrical engineering, equipment procurement and start up for a four CAT G3516 LFG fueled reciprocating engine generator facility, 3.2 MW capacity | December 1988 |
| ELDA, Cincinnati, OH | Waste Management, Inc. | Direct Gas | Equipment procurement and start up for a medium BTU gas compression and dehydration facility for customer end-use gas; 3.6 MMSCFM capacity. | April 1988 |